Resource · FAQ
Frequently asked questions
The questions corporate buyers ask most, with short, clear answers. If your question isn't here, let's answer it on a call.
- Where does your data come from?
- Copernicus Sentinel-1 (radar) and Sentinel-2 (optical) satellites, Landsat thermal observation, multi-year climate reanalysis, global soil databases and a digital elevation model. On the field side, DronGelsin's drone and ground verification is in play. See our methodology page for detail.
- Where do you get parcel boundaries? Can we upload our own parcel list?
- There is a ready base of 20M+ parcels across 81 provinces; parcels not in the pool, or added later, are brought into the same framework. You can upload your own parcel list as polygons/GeoJSON.
- What is your relationship with ÇKS / TARSİM data?
- We are not an official data provider for ÇKS or TARSİM. We can work with parcel/policy data from these systems and discuss integration on a per-institution basis; but our analyses rest on independent satellite, climate and soil data.
- How do you measure and report your accuracy?
- Through field validation (DronGelsin) and cross-validation (radar ↔ optical, neighboring parcel, past season). Today we offer 80%+ classification accuracy for 20 crops; every output arrives with a confidence level. The method and limits are open on the methodology page.
- How is our data processed under KVKK?
- The data controller is AKD Havacılık Tarım Haritacılık Arge Yayıncılık Pazarlama Sanayi Tic. Ltd. Şti. Field data (coordinates, GeoJSON) is not transferred to third-party services; remote-sensing processing runs on our own infrastructure. See the KVKK privacy notice for detail.
- Is there an API? Is on-premise installation possible?
- The analyses produced can be taken as PDF, Excel, DOCX, API and dashboard; the API and export are part of the product line. On-premise or private-cloud installation is assessed based on your scope.
- How are the reports used in a TSRS / IFRS S2 audit process?
- Tarımus feeds directly into land-based physical climate-risk disclosures, and every finding is auditable down to its source (Evidence Vault). Your compliance team uses the report directly instead of rebuilding it.
- Which outputs do you provide for EUDR due diligence?
- Parcel boundary and polygon (geolocation), land use and change detection, forest-cover comparison against the 31 December 2020 baseline, and a satellite-based deforestation-free indicator. These feed your due diligence statement.
- How does pricing work?
- Three models: single analysis per parcel, a regional/portfolio license, and an annual enterprise subscription. We prepare a proposal based on your scope; the first pilot report is free.
- How does the pilot process proceed, and how long does it take?
- We start with a free preliminary study: you see the first output on your own parcel samples before the pilot. Then comes a fixed-price, narrow-scope pilot; as results become visible, the same framework extends to a wider portfolio.
Invitation
Let's Write the Next Chapter of Agriculture Together.
Food company, exporter, bank, insurer, cooperative or ESG advisor — let's talk through a pilot report for your sourcing region or portfolio. We'll listen, and we'll show you.
VerifiableTSRS-alignedSustainable